40+ Years of Engineering Excellence WhatsApp
Pakistan's Most Trusted Electrical Engineering Firm

Stop Guessing Your Energy Costs.Build a Resilient Grid.

Bringing zero-fault-tolerance engineering from Saudi Arabia's Royal Facilities to Pakistan. We deploy proprietary Smart Scan Auditing and predictive data models to map your load, eliminate parasitic energy waste, and blueprint a future-proof ecosystem.

40+
Years Experience
500+
Projects Delivered
120+
Satisfied Clients
25 MW
Solar Installed
Scroll
Trusted By

Engineering Services That Power Pakistan

From 132kV grid stations to rooftop solar — we deliver end-to-end electrical engineering solutions with 40 years of proven expertise.

EV Infrastructure & Smart Charging

AC (7–22 kW) & DC fast charging (60–350 kW), load-sharing controllers, OCPP v2.0.1 backend, dynamic peak-demand avoidance, transformer capacity studies, civil & electrical turnkey installation.

Learn More

Solar Backup & Hybrid Integration

Grid-tied / hybrid / off-grid PV, LiFePO4 battery banks (5 kWh–2 MWh), smart hybrid inverters, net-metering facilitation, PVsyst modeling, arbitrage dispatch algorithms, 25-year NPV projections.

Learn More

Smart Scan Audit & Blueprint

Infrared thermal mapping (FLIR), Class-A power quality logging, harmonic profiling to 50th order, protective coordination studies, load-growth forecasting, 40+ page PE-reviewed report, 12-month phased roadmap with budget estimates.

Learn More
40+
Years of Engineering Excellence
500+
Projects Completed
25 MW
Solar Capacity Installed
0 LTI
Safety Record (Lost Time Injuries)

Landmark Projects Across Pakistan

From 132kV grid stations in Karachi to solar farms in Punjab — our portfolio speaks for itself.

Engineering Excellence You Can Trust

We don't just build electrical systems — we build lasting partnerships based on quality, safety, and integrity.

40+ Years of Proven Expertise

Established in 1984, we bring four decades of hands-on electrical engineering experience to every project — from 11kV to 132kV systems.

Uncompromising Safety Standards

Zero Lost Time Injuries across all project sites. NEBOSH-certified HSE team and rigorous permit-to-work systems.

Licensed & Certified

PEC registered, NEPRA licensed, and compliant with WAPDA, K-Electric, and all major DISCOs. ISO 9001 quality management system.

Expert Engineering Team

80+ qualified electrical engineers, many trained in the UK, Germany, and US — bringing world-class expertise to Pakistan.

On-Time, In-Budget Delivery

Our project management methodology ensures we deliver on schedule and within budget — without compromising quality.

24/7 After-Sales Support

Round-the-clock operations & maintenance support with real-time remote monitoring for all installed systems.

What Our Clients Say About Us

"AK SMARTECH delivered our 132kV grid station 3 weeks ahead of schedule with zero safety incidents. Exceptional professionalism."

I
Imran Sheikh
GM Projects, K-Electric

"The 5 MWp solar farm has exceeded projected yield by 8%. AK SMARTECH's after-sales support is outstanding."

A
Ayesha Noor
Director Engineering, Engro Foods

"Migrating from decades-old relay logic to modern SCADA seemed daunting. AK SMARTECH made it seamless. Production uptime improved dramatically."

K
Khalid Mirza
COO, Nishat Mills

"The energy audit uncovered savings we never knew existed. ROI on their recommendations was achieved in 14 months."

D
Dr. Faisal Qureshi
VP Operations, Lucky Cement

Latest Insights & Industry News

Industry News May 21, 2026

Pakistan's Solar Energy Capacity Crosses 1 GW — What It Means for Industry

Pakistan's installed solar capacity has crossed the 1 GW milestone. Here's what this shift means for industrial power consumers and EPC cont…

Technical May 21, 2026

Understanding 132kV GIS vs AIS Substations — A Practical Guide

Gas-insulated switchgear (GIS) and air-insulated switchgear (AIS) each have their place. Our engineers break down the decision criteria.

Technical May 21, 2026

5 Common Power Quality Problems in Pakistani Factories — and How to Fix Them

Voltage sags, harmonics, and poor power factor cost Pakistani industry billions annually. Here are the top 5 issues and their solutions.

Ready to Power Your Next Project?

Talk to our engineers today. Free consultation and no-obligation quotation.

Request a Free Quote Call Us Now